News

Petrochina Liaoyang Petrochemical Company ordered KING-PLUS FFS production line and finished the acceptance trial.

Liaoyang Petrochemical Company ordered a FFS three-layer heavy duty sack blown film machine with on-line printer and embossing device production line from King-Plus on September 25, 2020. At that time, King-Plus became one of the members in the project, to produce 300 thousand tons of high-performance polypropylene in Liaoyang Petrochemical.

It took more than five months to manufacture the machine, including confirmation of the configuration and position, quality control, test for electrical control system, installation and adjustment at factory, and recording the completion report. After that, we disassembled, rechecked and fixed each part of the machine on pallets, and loaded to containers to be shipped to Tianjin Port.
dual-use machinedual-use machine

The King-Plus engineers went to Liaoyang Petrochemical Company to finish the installation and adjustment of the machine. It was checked and formally accepted on May 25, 2021.
dual-use machinedual-use machinedual-use machine